MeasureMate
Driveways · Paths · Drainage

Gravel Calculator

Enter the area in feet and the depth in inches. A driveway usually needs 4–6 inches; a garden path 2–3 inches.

ft
ft
in
$
Result–

    Gravel for common areas

    Area and depthCubic yardsTons (crushed stone)
    10 × 10 ft, 2 in deep0.620.86
    10 × 10 ft, 4 in deep1.231.73
    10 × 20 ft, 2 in deep1.231.73
    10 × 20 ft, 4 in deep2.473.46
    12 × 40 ft, 2 in deep2.964.15
    12 × 40 ft, 4 in deep5.938.3
    20 × 20 ft, 2 in deep2.473.46
    20 × 20 ft, 4 in deep4.946.91
    10 × 50 ft, 2 in deep3.094.32
    10 × 50 ft, 4 in deep6.178.64
    20 × 50 ft, 2 in deep6.178.64
    20 × 50 ft, 4 in deep12.3517.28

    Cubic yards = length (ft) × width (ft) × depth (in) ÷ 12 ÷ 27
    Tons = cubic yards × density (about 1.4 for crushed stone)

    Questions

    How many tons of gravel do I need for a driveway?

    A 12 × 40 ft driveway at 4 inches deep needs about 5.9 cubic yards, or roughly 8.3 tons of crushed stone. Add 10% for compaction.

    How much does a cubic yard of gravel weigh?

    About 1.3 to 1.5 tons (2,600–3,000 lb), depending on the stone.

    How deep should gravel be?

    2–3 inches for paths, 4 inches for a driveway top layer, and 6–8 inches total over a base for heavy traffic.